Doubling The Capacity Of The Sorek Sewage Treatment Plant Project

As part of the project in the Sorek STP to enlarge the filtration pools, DAKAR company was
required to set huge and massive concrete pillars inside the existing pool that are designed
to carry the second floor pool. Due to the massive weight, maximum accuracy was required
and there was no place for any deviation in placing the foundations.

The work was carried out with millimeter precision and success, while maintaining the
strictest safety of the diver.